What is V Model ?
V- model means Verification and Validation model. Just like the waterfall model, the V-Shaped life cycle is a sequential path of execution of processes. Each phase must be completed before the next phase begins.  Testing of the product is planned in parallel with a corresponding phase of development.
The various phases of the V-model are as follows:
Requirements like BRS and SRS begin the life cycle model just like the waterfall model. But, in this model before development is started, a system test plan is created.  The test plan focuses on meeting the functionality specified in the requirements gathering.
The high-level design (HLD) phase focuses on system architecture and design. It provide overview of solution, platform, system, product and service/process. An integration test plan is created in this phase as well in order to test the pieces of the software systems ability to work together.
The low-level design (LLD) phase is where the actual software components are designed. It defines the actual logic for each and every component of the system. Class diagram with all the methods and relation between classes comes under LLD. Component tests are created in this phase as well.
The implementation phase is, again, where all coding takes place. Once coding is complete, the path of execution continues up the right side of the V where the test plans developed earlier are now put to use.
Coding: This is at the bottom of the V-Shape model. Module design is converted into code by developers.
Advantages of V-model:
  • Simple and easy to use.
  • Testing activities like planning, test designing happens well before coding. This saves a lot of time. Hence higher chance of success over the waterfall model.
  • Proactive defect tracking – that is defects are found at early stage.
  • Avoids the downward flow of the defects.
  • Works well for small projects where requirements are easily understood.
Disadvantages of V-model:
  • Very rigid and least flexible.
  • Software is developed during the implementation phase, so no early prototypes of the software are produced.
  • If any changes happen in midway, then the test documents along with requirement documents has to be updated.
When to use the V-model:
  • The V-shaped model should be used for small to medium sized projects where requirements are clearly defined and fixed.
  • The V-Shaped model should be chosen when ample technical resources are available with needed technical expertise.
In the V Model Software Development Life Cycle, based on same information(requirement specification document) the development & testing activity is started. Based on the requirement document developer team started working on the design & after completion on design start actual implementation and testing team starts working on test planning, test case writing, test scripting. Both activities are working parallel to each other. In Waterfall model & V-model they are quite similar to each other. As it is most popular Software Testing Life Cycle model so most of the organization is following this model.
The V-model is also called as Verification and Validation model. The testing activity is perform in the each phase of Software Testing Life Cycle phase. In the first half of the model Verification testing activity is integrated in each phase like review user requirements, System Design document & in the next half the Validations testing activity is come in picture.
Typical V-model shows Software Development activities on the Left hand side of model and the Right hand side of the model actual Testing Phases can be performed.
In this process “Do-Procedure” would be followed by the developer team and the “Check-Procedure” would be followed by the testing team to meets the mentioned requirements.
In the V-Model software development life cycle different steps are followed however here we will taking a most common type of V-model example. The V-model typically consist of the following phases:
1. Unit Testing: Preparation of Unit Test Cases
2. Integration Testing: Preparation of Integration Test Cases
3. System Testing: Preparation of System test cases
4. Acceptance Testing: Preparation of Acceptance Test Cases

- See more at: http://www.softwaretestingclass.com/v-model/#sthash.3k83zn6g.dpuf
In the V Model Software Development Life Cycle, based on same information(requirement specification document) the development & testing activity is started. Based on the requirement document developer team started working on the design & after completion on design start actual implementation and testing team starts working on test planning, test case writing, test scripting. Both activities are working parallel to each other. In Waterfall model & V-model they are quite similar to each other. As it is most popular Software Testing Life Cycle model so most of the organization is following this model.
The V-model is also called as Verification and Validation model. The testing activity is perform in the each phase of Software Testing Life Cycle phase. In the first half of the model Verification testing activity is integrated in each phase like review user requirements, System Design document & in the next half the Validations testing activity is come in picture.
Typical V-model shows Software Development activities on the Left hand side of model and the Right hand side of the model actual Testing Phases can be performed.
In this process “Do-Procedure” would be followed by the developer team and the “Check-Procedure” would be followed by the testing team to meets the mentioned requirements.
In the V-Model software development life cycle different steps are followed however here we will taking a most common type of V-model example. The V-model typically consist of the following phases:
1. Unit Testing: Preparation of Unit Test Cases
2. Integration Testing: Preparation of Integration Test Cases
3. System Testing: Preparation of System test cases
4. Acceptance Testing: Preparation of Acceptance Test Cases

- See more at: http://www.softwaretestingclass.com/v-model/#sthash.3k83zn6g.dpuf
In the basic Waterfall model process seen some disadvantages or limitations in the model which started a new SDLC model. As we seen in the Waterfall model the issues found in the end of the SDLC, this is due to the testing is occurred in the end phases of the you SDLC. To overcome this problem the V-Model is comes into the picture. It is always better to introduce testing in the early phase of SDLC, as in this model the testing activity gets started from the early phase of the SDLC.
Before starting the actual testing, testing team has to work on various activities like preparation of Test Strategy, Test Planning, Creation of Test cases & Test Scripts which is work parallel with the development activity which help to get the test deliverable on time.
- See more at: http://www.softwaretestingclass.com/v-model/#sthash.3k83zn6g.dpuf

1 comment:

  1. Hello Rishi,
    The Article on What is V Model is amazing , gives detailed information about it. Thanks for Sharing the information about the V model software App Development For More information check the detail on the Waterfall testing here Software Testing Services

    ReplyDelete

Popular Posts

Copyright © Manual Testing | Powered by Blogger
Design by Duan Zhiyan | Blogger Theme by NewBloggerThemes.com